{"id":15003,"date":"2022-04-13T13:04:00","date_gmt":"2022-04-13T11:04:00","guid":{"rendered":"https:\/\/www.came.com\/uk\/?p=15003"},"modified":"2026-05-08T13:50:32","modified_gmt":"2026-05-08T11:50:32","slug":"came-domotic-3-0-moves-into-four-apartment-blocks-in-luxembourg","status":"publish","type":"post","link":"https:\/\/www.came.com\/uk\/case-histories\/came-domotic-3-0-moves-into-four-apartment-blocks-in-luxembourg\/","title":{"rendered":"CAME Domotic 3.0 moves into four apartment blocks in Luxembourg"},"content":{"rendered":"\n<p><strong>CAME<\/strong>&nbsp;has just completed a noteworthy&nbsp;<strong>domotic project<\/strong>, by upgrading four apartment compounds in Luxembourg&#8217;s main cities, to the very latest&nbsp;<strong>CAME Domotic 3.0 technology<\/strong>.<\/p>\n\n\n\n<ul>\n<li>The first phase saw the fitting of the entire Les \u00c9tangs residential compound, over its\u00a0<strong>12,800 square meter facilities<\/strong>, in the high-end district of Mondorf-les-Bains, which holds\u00a0<strong>146 apartments\u00a0<\/strong>grouped into five buildings, that sit surrounded by water-plant pools.<\/li>\n\n\n\n<li>Then, CAME completed projects Florea at Schifflange, a compound that features\u00a0<strong>686 apartments<\/strong>,\u00a0<strong>42 homes and 2,000 square meters<\/strong>\u00a0of business facilities,<\/li>\n\n\n\n<li>Mondriani at Kohlenberg, an apartment building made up of 16 luxury apartments.<\/li>\n\n\n\n<li>The last project was Cloche d\u2019Or, another 850 unit apartment compound amidst a park.<\/li>\n<\/ul>\n\n\n\n<p>All this totals about 2,000 domotic apartments. Interestingly,<strong>&nbsp;the project is ongoing<\/strong>, as the number of new apartments fitted with&nbsp;<strong>CAME Domotic 3.0<\/strong>&nbsp;is set to grow.<\/p>\n\n\n\n<p><strong>Products:<\/strong><\/p>\n\n\n\n<ul>\n<li>Aproximately 150 Digitha entry panels;<\/li>\n\n\n\n<li>Aproximately 2,000 CAME Domotic 3.0 indoor derivatives;<\/li>\n\n\n\n<li>Aproximately 2,000 Proxinet8 burglar alarm units.<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-group alignwide came-box-gallery-slider is-layout-flow wp-block-group-is-layout-flow\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>CAME&nbsp;has just completed a noteworthy&nbsp;domotic project, by upgrading four apartment compounds in Luxembourg&#8217;s main cities, to the very latest&nbsp;CAME Domotic 3.0 technology. All this totals about 2,000 domotic apartments. Interestingly,&nbsp;the project is ongoing, as the number of new apartments fitted with&nbsp;CAME Domotic 3.0&nbsp;is set to grow. Products:<\/p>\n","protected":false},"author":16,"featured_media":15004,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single_case-history.php","format":"standard","meta":{"elastic_search":"","powered_cache_disable_cache":false,"footnotes":""},"categories":[30],"tags":[],"_links":{"self":[{"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/posts\/15003"}],"collection":[{"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/users\/16"}],"replies":[{"embeddable":true,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/comments?post=15003"}],"version-history":[{"count":0,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/posts\/15003\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/media\/15004"}],"wp:attachment":[{"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/media?parent=15003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/categories?post=15003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.came.com\/uk\/wp-json\/wp\/v2\/tags?post=15003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}