{"id":14155,"date":"2026-11-06T11:09:01","date_gmt":"2026-11-06T10:09:01","guid":{"rendered":"https:\/\/www.came.com\/global\/?p=14155"},"modified":"2026-11-06T11:09:04","modified_gmt":"2026-11-06T10:09:04","slug":"arena-bosco-sport-venice-came-access-control","status":"publish","type":"post","link":"https:\/\/www.came.com\/global\/en\/news\/arena-bosco-sport-venice-came-access-control\/","title":{"rendered":"Venice&#8217;s Arena del Bosco dello Sport: CAME Access Control Solutions\u00a0"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">18 full-height turnstiles, dedicated access for people with reduced mobility and 2 automatic barriers to manage vehicle access to the Arena<\/h2>\n\n\n\n<p>CAME brings its access control solutions to the Arena del Bosco dello Sport in Venice, a new 10,000-seat multipurpose venue designed to host sporting events, concerts and live performances.<\/p>\n\n\n\n<p>This project further demonstrates our expertise in <a href=\"https:\/\/www.came.com\/global\/en\/products\/turnstiles\/\">access control solutions<\/a> for major sports venues, where efficient crowd flow management is essential to event operations and the overall visitor experience.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Arena del Bosco dello Sport: a new venue for major events in Venice<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.came.com\/it\/wp-content\/uploads\/2026\/11\/came_bosco_dello_sport_20261020135114-cover.jpg\" alt=\"\" class=\"wp-image-18965\"\/><\/figure>\n\n\n\n<p>Located near Venice Marco Polo Airport, the Arena is one of the key developments within Bosco dello Sport, Venice&#8217;s new hub for sports and major events.<\/p>\n\n\n\n<p>The newly built venue extends across four levels and includes dedicated areas for spectators, teams, performers and event-related services.<\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-1 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-text-align-center wp-element-button\" href=\"https:\/\/www.came.com\/global\/en\/case-histories\/came-arena-del-bosco-dello-sport\/\"><strong>DISCOVER THE PROJECT<\/strong><\/a><\/div>\n<\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">18 full-height turnstiles to manage spectator access<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.came.com\/it\/wp-content\/uploads\/2026\/11\/came_bosco_dello_sport_20261020134834.jpg\" alt=\"\" class=\"wp-image-18964\"\/><\/figure>\n\n\n\n<p>To manage spectator entry across the different sectors of the Arena, we have installed 18 full-height turnstiles <strong>with four sectors<\/strong>.<\/p>\n\n\n\n<p>Featuring stainless steel rotors and designed for integration with ticket readers, <a href=\"https:\/\/www.came.com\/global\/en\/products\/full-height-turnstiles\/\">these turnstiles<\/a> will help control access and ensure an orderly flow of spectators during events.<\/p>\n\n\n\n<p>This solution is designed for high-traffic environments, where effective access management and controlled pedestrian flow are essential to maintaining safety and order.<\/p>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Automatic barriers to control authorised vehicle access<\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/www.came.com\/it\/wp-content\/uploads\/2026\/11\/came_bosco_dello_sport_20261020143841.jpg\" alt=\"\" class=\"wp-image-18970\"\/><\/figure>\n\n\n\n<p>In addition to pedestrian access, the project also includes vehicle access management.<\/p>\n\n\n\n<p>Two CAME automatic barriers have been installed at entrances reserved for sports teams&#8217; buses and authorised staff vehicles. <a href=\"https:\/\/www.came.com\/global\/en\/products\/automatic-barriers-gard-gt8\/\">These barriers<\/a> will help regulate vehicle movements within designated areas, keeping authorised vehicle routes separate from other access routes within the Arena complex.<\/p>\n\n\n\n<div style=\"height:17px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Accessible entry points for people with reduced mobility<\/h2>\n\n\n\n<p>To make the Arena accessible to everyone, the project also includes the <a href=\"https:\/\/www.came.com\/global\/en\/products\/swing-turnstiles-glb1\/\">installation of the GLB1<\/a>, a motor-driven swing turnstile with a customisable leaft, designed to facilitate access for people with reduced mobility.<\/p>\n\n\n\n<p>With a clear passage width of 900 mm, this solution provides easy and comfortable access and integrates with the Arena&#8217;s access control system, helping make entry points more accessible and suited to the needs for all spectators.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">CAME&#8217;s experience in major international sports venues<\/h2>\n\n\n\n<div style=\"height:24px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p>The Arena del Bosco dello Sport adds to our portfolio of major projects, where access control technologies help make pedestrian and vehicle access management more efficient and secure.<\/p>\n\n\n\n<p>Our international references include the Stade de France in Paris, as well as numerous sports facilities in the Netherlands, Poland, Romania and Qatar.<\/p>\n\n\n\n<p>Projects like these allow us to contribute to the development of venues designed to accommodate large numbers of visitors, providing tailored technological solutions to meet a wide range of access management and control requirements.<\/p>\n\n\n\n<p><em>The project was commissioned by the City of Venice and awarded to a consortium led by CEV S.p.A., together with Gianni Benvenuto S.p.A., Milani S.p.A. and MAEG Costruzioni S.p.A.<\/em><\/p>\n\n\n\n<div class=\"wp-block-buttons is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-2 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button is-style-fill\"><a class=\"wp-block-button__link has-text-align-center wp-element-button\" href=\"https:\/\/www.came.com\/global\/en\/contact-us\/\"><strong>CONTACT US<\/strong><\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>CAME brings its access control solutions to the Arena del Bosco dello Sport in Venice, a new 10,000-seat multipurpose venue designed to host sporting events, concerts and live performances.<\/p>\n","protected":false},"author":15,"featured_media":14156,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"single_news.php","format":"standard","meta":{"elastic_search":"","powered_cache_disable_cache":false,"footnotes":"[]"},"categories":[62,2336],"tags":[],"_links":{"self":[{"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/posts\/14155"}],"collection":[{"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/comments?post=14155"}],"version-history":[{"count":1,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/posts\/14155\/revisions"}],"predecessor-version":[{"id":14157,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/posts\/14155\/revisions\/14157"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/media\/14156"}],"wp:attachment":[{"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/media?parent=14155"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/categories?post=14155"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.came.com\/global\/en\/wp-json\/wp\/v2\/tags?post=14155"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}